top of page

Installation of residential and commercial renewable energy for energy savings

Energy saving

These are some of our success stories

Ferrero de México - San Jose Iturbide, Guanajuato

Development of basic engineering for a 15 MW Load Center, for the admission of the Study of Installations before CENACE. (February 2024).

 

Resolution with the interpretation of the Connection and Reinforcement Works to the Grid (April 2024).

 

Detailed engineering is currently being developed for the potential construction of its Electric Substation in Alte Tension 115/34.5 kV.

CASO-FERRERO.jpg
CASO-DELVALLE.jpg
Jugos del Valle – Santa Clara – Lagos de Morenos, Jalisco

Connection point change study before CENACE for the potential construction of a 7.5 MW high voltage 115/13.5 kV private substation (January 2024).
 

Advice for the private Electric Substation bidding process.

Grupo Salinas – Elektra – Insurgentes Sur, Ciudad de México

Energy diagnosis for the migration of fee change (PDBT to GDBT), in 228 stores in Mexico City, State of Mexico, Morelos, Queretaro, Guadalajara, Hidalgo, Puebla and Nuevo Leon.

CASO-SALINAS.jpg
CASO-CENTRAL.jpg
Central de Abastos – Iztapalapa, Ciudad de México

Support with specialized technical personnel authorized by HUAWEI Mexico, for the
commissioning, training and start-up of the first stage of the 500 kWp Photovoltaic Power Plant.

Carrera Corporación - Galeras, Querétaro

The Studies of Installations and Impact to the Grid were managed with CENACE. As well as the detailed engineering for the construction of the 30 MVA electrical substation.
 

ITenergy is currently participating in the supervision of the construction of the 115 kV substation.